Stoney River Memory Care
We have finally reached the end of the project at E-470 and Gartrell that provides a safe place for Seniors who require extra professional care. Construction began on the 46,000 square foot Stoney River Memory Care building in October of 2015 and residents will be moving in during November 2016. Priority Restoration provided and installed a 50,000 sft Cold Roof system which included above-deck insulation and an Atlas StormMaster Impact Resistant Roof System. We also installed a Weatherbond EPDM flat roof for the mechanical well, all of the vinyl siding and composite trim, and all of the gutters and downspouts.